Site prep is where a Paradise ADU project succeeds or stalls. Before a single line is drawn, the ground work and utility routes decide whether Clark County will approve your plan, and whether the numbers hold. We know the 89105 parcels and the township’s covenant layering well enough to price the trenching, panel, lateral and grading honestly up front. If you’re in Paradise weighing an ADU, call (833) 632-6140 for a free estimate and a written price before any work starts.
Why Ellery ADU Studio Henderson Is Paradise’s Preferred ADU Site Prep & Utilities Company

Paradise homeowners research before they call, and that suits us. We’re a design-build studio, not a contractor, so the drawings, the permit set and the site work sit under a single contract at a single written price. That structure matters here because Paradise’s dual-jurisdiction setup – Clark County’s Title 30 review plus the private covenants layered on top by planned-community and HOA overlays – means the site plan and the design have to be solved together, not handed back and forth.
Our technicians have up to 11 years of experience, and every one is background-checked, uniformed, and works under a license number that appears on every page. Under The Haven Standard, every project carries a written price before work begins (Clause 1), a documented photo record of what we found and what we did, and a 365-Day Done Right Promise backed in writing. We’ve designed and built 900+ ADUs since 2015, and a Free Second Opinion is available on any written estimate you already hold. A live person answers calls 24/7 – no voicemail queue. When you call about Paradise site prep, someone picks up.
Our ADU Site Prep & Utilities Services in Paradise
Three of the five sub-services carry most Paradise ADU projects here: electrical, plumbing lateral, and foundation with grading. The rest fill in around them. You can see the full scope on our ADU Site Prep & Utilities page if you want the broader picture.
Electrical Panel Upgrade in Paradise
This is the line item that trips plan check most often in Paradise’s newer stucco-and-tile subdivisions. Builder-grade 100-amp panels sized for a house-only load won’t carry a second dwelling, and Clark County wants the load calculation before it approves the site plan. A dedicated-meter panel and service upgrade typically runs $3,200-$6,800 in Paradise depending on trench distance and meter placement.
Plumbing Lateral in Paradise
The existing sewer lateral is often on the far side of the slab, and a straight route can cross the driveway or a mature shade tree’s root zone. We survey utilities first, then route the lateral to keep hardscape and roots intact. A typical Paradise lateral with trenching runs $2,400-$5,600, and it’s reviewed against recorded lot coverage along with the rest of the site plan.
Foundation & Grading in Paradise
Many Paradise pockets carry mid-century single-story tract homes alongside newer builds, and older detached garages often sit on thin slabs. We check recorded setback and coverage history before drawing, so a conversion doesn’t stall on standards the new habitable space no longer meets. Grading that sheds monsoon runoff away from both structures – and a roof tie-down check on the ADU side – is part of the work. Foundation and grading runs $4,500-$9,200 for a detached ADU in Paradise.
Gas Line Extension in Paradise
Single stub-outs sized for a house-only load are common in Paradise’s newer builds, so a gas run to a second dwelling is usually a fresh extension rather than a tie-in. Expect $1,100-$2,800 in Paradise, coordinated with the electrical trench where possible to save grading.
Landscaping & Hardscape
Once trenches close, restoring concrete, pavers and drip lines is the visible finish. We keep the footprint tight and match existing materials so the ADU doesn’t read as an addition.
Trusted Brands We Service in Paradise
When a Paradise project calls for a prefab or modular unit, we specify and coordinate the system inside the same single contract. That includes brands like Dvele, Mighty Buildings and Plant Prefab, alongside Abodu, Cover, Boxabl, Tuff Shed and James Hardie where the lot and covenant allow. We don’t stock parts and we don’t run a yard – the independent local professionals on your job work from the approved set. What matters is that the site prep lines up with the system’s requirements before the factory order ships, so nothing sits in a Paradise driveway waiting on a panel upgrade.
Common ADU Site Prep & Utilities Problems We See in Paradise Homes
A typical Paradise site-prep problem shows up like this: a detached ADU or garage conversion needs its own service and sewer route, the builder-grade panel is already near capacity, and the house’s lateral sits opposite the new footprint. A straight trench would cross the driveway and a mature shade tree. The fix is a load calculation first, then a dedicated meter and panel with gas and sewer routed to keep hardscape and root zones intact, and graded to shed monsoon water away from both structures.
- Permit before load calculation. Pulling the electrical permit before running the calc, then finding the builder-grade panel can’t carry a second dwelling and the service upgrade needs county review anyway – the schedule absorbs the delay.
- Trenching across hardscape or roots. Running the lateral or gas line on the shortest path because the site survey skipped utilities, then paying twice to repair the driveway and a mature tree’s root zone.
- Grading toward the house or pad. Pitched the wrong way, it fails Clark County drainage review and turns monsoon-season pooling into a standing-water problem at both foundations.
- Drawing before coverage history. Sketching the ADU footprint before pulling the parcel’s recorded coverage and setback history – the commonest cause of a redraw in Paradise’s older east-side pockets.
Pricing for ADU Site Prep & Utilities in Paradise, NV

Paradise site prep isn’t a single number. Here’s what the line items usually run, quoted in writing before any work:
- Electrical panel upgrade and dedicated meter: $3,200-$6,800
- Plumbing lateral with trenching: $2,400-$5,600
- Foundation and grading for a detached ADU: $4,500-$9,200
- Gas line extension: $1,100-$2,800
- Landscape and hardscape restoration: $900-$2,400
Trench distance, panel placement against recorded lot coverage, and whether the existing slab can stay all move the total. Every quote carries a written price before work starts. If you already have an estimate in hand, the second opinion is free.
We Also Serve Cities Near Paradise
Site prep and utility work for Paradise projects regularly reaches into Winchester, Whitney, Spring Valley and Enterprise, and the same dual-jurisdiction care applies across the east side. If your lot sits near a boundary, it’s worth confirming which jurisdiction and which HOA overlay apply before anything is drawn.
Serving Paradise, NV – Our Local Coverage Area
We serve Paradise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – ADU Site Prep & Utilities in Paradise

No, not if the work is done by licensed professionals and inspected under a proper county permit. Builder warranties protect against defects in the builder’s own work, not against owner-added, code-compliant improvements made by others. The risk is unpermitted work, so we pull the permit, keep the load calculation documented, and hand you a photo record you can show the builder if any question comes up. Call (833) 632-6140 for a free estimate on the panel and utility scope.
Both do, in sequence – Clark County under Title 30 sets the code, and your HOA overlay adds private covenants your plan has to satisfy on top. Because Paradise is unincorporated, there’s no municipal permit desk; everything runs through county review, and the HOA architectural committee signs off separately. We read both before drawing. Call (833) 632-6140 for a free estimate that accounts for both layers.
Usually a dedicated meter and panel plus a sewer lateral and gas route, and often a foundation check – roughly $6,000-$12,000 for the utility and slab work on a conversion. The number swings with trench distance and whether the existing slab was permitted under older coverage and setback standards. We check that first. Call (833) 632-6140 for an exact written price.
Yes, it should – triple-digit summers and intense sun mean a detached ADU or garage conversion will bake without its own cooling load. We size the electrical service to carry that separate system, which is part of why the panel upgrade comes first. Call (833) 632-6140 for a free estimate.
Grading that moves runoff away from both the existing house and the new ADU pad, reviewed against flash-flood and drainage standards during county review. Flat or inward-pitched ground fails review and worsens monsoon-season pooling. We grade to shed water and document it. Call (833) 632-6140 for a free estimate.
Whether your lot sits in the newer stucco-and-tile subdivisions or an older east-side pocket, the site work decides the schedule. Call (833) 632-6140 for a free estimate on ADU site prep and utilities in Paradise – you’ll get a written price before any work begins, an honest read on what the county and your HOA will require, and a team that answers the phone when you call.
Written by the team at Ellery ADU Studio.