Title 24 Energy Compliance in Henderson, NV
Title 24 energy compliance is the modeling, documentation, and inspection package that proves your Henderson ADU meets California’s Building Energy Efficiency Standards. You need it on every new detached ADU, garage conversion, and Junior ADU permit before the city will issue a final. We treat it as part of the permit set, not a formality bolted on at the end, which is why the compliance report is finished alongside the drawings. If you’re weighing any addition, our ADU Design & Permitting in Henderson page shows how the full permit package fits together, and the parent ADU Design & Permitting service explains the single-contract model behind it. Call (833) 632-6140 and a live person will answer, day or night.
Henderson sits in a desert climate zone that pushes hard on envelope performance. Summer design temperatures above 110°F mean a Title 24 model cares about shading, cool roofs, and window orientation far more than it does in coastal California. A permit set that ignores this gets flagged in plan review, and a flagged set is a stalled project. Our technicians have up to 11 years of experience reading these models against what actually gets built, which matters when the numbers on paper have to survive the July sun in Green Valley and Anthem.
Key Takeaways
- Every ADU permit in Henderson requires a Title 24 energy compliance report before issuance.
- Compliance modeling should be finished alongside the permit drawings, not after plan check.
- Desert climate zone factors into window selection, roof reflectivity, and HVAC sizing.
- Written price before any work starts, per Haven Standard Clause 1.
- A Free Second Opinion is available on any written estimate you already have in hand.
- Prefab and modular systems from Abodu, Cover, and Dvele each carry their own compliance documentation we coordinate.

When You Need Title 24 Energy Compliance
The standard applies to new construction and to many alterations, but the situations below are where Henderson homeowners most often discover they need a report. If any sounds familiar, the compliance question is worth resolving before design work moves forward.
- You’re permitting a new detached ADU. A new dwelling unit triggers a full Title 24 compliance package, including the energy model, the certificate of compliance, and field verification of insulation and duct work. This is true whether the unit is stick-built or a modular system like Abodu or Cover.
- You’re converting a garage to living space. A garage conversion changes a space the code never treated as conditioned into one that is, so the envelope and mechanical systems both have to be modeled fresh. Brandiwood and Lake Las Vegas conversions run into this because the existing garage walls were not insulated to habitable-space standards.
- Your plans were flagged in plan review. Henderson plan checkers reject permit sets for missing or inconsistent energy documentation more often than most homeowners expect. When a set is kicked back, the fix is a corrected model, not a resubmission of the same paperwork.
- You’re adding a Junior ADU inside the existing footprint. A JADU that creates a new kitchen or adds a bath changes the conditioned load and water heating, which means a compliance report is usually required even though the square footage is small.
- You’re installing or resizing HVAC for the addition. A new mini-split or a load recalculation on the existing system requires documented sizing that matches the energy model. Mismatches here are a common reason final inspection gets delayed.
- You’re buying a modular unit and the manufacturer’s compliance packet doesn’t match Henderson’s local amendments. Prefab brands publish their own energy documentation, but local amendments and site conditions still have to be reconciled, and that reconciliation is what we handle.
Our Title 24 Energy Compliance Process
Compliance runs in parallel with the drawings in our workflow. Here’s the sequence, in order.
- Review the design against the climate zone. We pull the Henderson project parameters, confirm the climate zone and occupancy assumptions, and note where the design as drawn is going to fight the energy model. Better to find that at sketch stage than at plan check.
- Model the envelope and mechanical systems. Windows, wall assembly, roof reflectivity, HVAC sizing, and water heating all get entered into the compliance software. We model the systems specified, not a stock assembly, because a substitution on-site later means the model is wrong.
- Coordinate prefab documentation where relevant. If the ADU is a Dvele or Mighty Buildings unit, we reconcile the manufacturer’s compliance documentation with the site-specific model so the two match before submittal.
- Assemble the compliance report into the permit set. The certificate of compliance, the field verification checklist, and the accompanying forms go into the permit package as a single submission. Nothing gets handed off separately.
- Support plan review and field verification. If the city comes back with questions, we respond. If the inspector needs field verification of insulation or duct leakage, we make sure the documentation is on site and matches what was built.
Each step ties to the written scope and the written price set at signing. Under Haven Standard Clause 5, the scope is locked when the project starts. No scope creep, no door-side addition to the compliance line item. And because the drawings, the permit set, and the construction sit in one contract, there’s no one to point at when a model and a built wall disagree. If the finished ADU isn’t built to the permitted drawings, we make it right under our 365-Day Done Right Promise.

Title 24 Energy Compliance Pricing in Henderson
Energy compliance for a Henderson ADU typically runs within the following ranges, all-in, for the modeling, documentation, and plan-review support described above. These are the numbers we work from, and your written estimate confirms the exact figure before any work starts.
| Line Item | Typical Range |
|---|---|
| New detached ADU energy compliance (full package) | $2,400 – $4,200 |
| Garage conversion ADU compliance | $1,600 – $2,900 |
| Junior ADU / interior conversion compliance | $1,100 – $2,200 |
| HVAC load recalculation tied to a compliance model | $450 – $900 |
| Plan-review response and model revision after flag | $350 – $800 per cycle |
| Prefab manufacturer documentation reconciliation | $400 – $1,000 |
What pushes a project toward the top of a range: complex geometry or heavy glazing facing west, a high-performance HVAC spec that needs careful sizing, or a modular unit whose manufacturer documentation needs substantial reconciliation with local amendments. What keeps it low: a simple rectangular footprint, a stock wall and roof assembly that already meets prescriptive requirements, and compliance modeling done in parallel with the drawings the first time.
Every figure we give is a written price before any work starts, consistent with Haven Standard Clause 1. There’s no “call for a quote” step with us; the number is in your written scope. If you already have a written estimate in hand from another provider, we’ll take a Free Second Opinion on it at no charge.
FAQs – Title 24 Energy Compliance
How much does Title 24 energy compliance cost for an ADU in Henderson?
Title 24 energy compliance for a Henderson ADU typically runs $2,400 to $4,200 all-in for a new detached unit, $1,600 to $2,900 for a garage conversion, and $1,100 to $2,200 for a Junior ADU or interior conversion. The exact number depends on footprint complexity, glazing, HVAC spec, and whether prefab documentation needs reconciling. Call (833) 632-6140 and we’ll confirm a written price before any work starts.
Do I need Title 24 compliance for a garage conversion in Henderson?
Yes, in most cases a garage conversion ADU in Henderson requires a Title 24 compliance report because the space goes from unconditioned storage to a conditioned dwelling. The envelope and mechanical systems have to be modeled for habitable use, and field verification of insulation and duct work is commonly required before final inspection. If you’re weighing a conversion, call (833) 632-6140 and we’ll walk through what your existing garage assembly needs.
Can you handle Title 24 compliance and the ADU build in one contract?
Yes. Compliance modeling, the permit set, and construction all sit under a single contract at a single written price, so the energy model and the built ADU are the same team’s responsibility. That matters at final inspection, when a model that doesn’t match the built wall becomes a problem. If the finished ADU isn’t built to the permitted drawings, our 365-Day Done Right Promise makes it right. Call (833) 632-6140 to start with a written scope.
What if my permit set gets flagged by Henderson plan review over energy documentation?
We respond to the flag, correct the model, and resubmit the corrected compliance package, typically within one response cycle of about $350 to $800 as shown in the pricing table above. Most flags trace to a missing certificate of compliance, a mechanical spec that doesn’t match the model, or a prefab documentation set that hasn’t been reconciled with local amendments. Call (833) 632-6140 and we’ll look at what was flagged.
Does the climate zone in Henderson change my compliance requirements?
Yes. Henderson’s desert climate zone places heavy weight on envelope performance and cooling load, which affects window selection, roof reflectivity, and HVAC sizing more than a coastal California model would. A design that would pass in a milder zone can require adjusted specifications here, and our technicians have up to 11 years of experience modeling these systems against what actually gets built in the Henderson heat.
Can you take over an ADU project mid-stream where compliance was handled by someone else?
We can. We’ll review the existing compliance report, the drawings, and any plan-review correspondence, then tell you in writing what’s still needed. A Free Second Opinion is available on any written estimate you already hold. Call (833) 632-6140 and a live person will pick up.
Have a Henderson ADU in the design stage? Call (833) 632-6140 for a free estimate. You’ll get a written price before any work starts, a documented photo record of what was found, and a scope locked at signing. Ellery ADU Studio Henderson is independently owned and operated, with a live person answering calls at any hour.
Written by the team at Ellery ADU Studio Henderson, serving Henderson.


