Site Assessment in Henderson, NV
A site assessment is the documented investigation of your lot before any drawing or permit application exists: where the buildable envelope sits, what the utilities and soil will allow, and which code constraints apply to your specific parcel. In Henderson, it typically costs $650 – $1,400 and takes one to two weeks to complete, closing with a written feasibility report and a photo record of what we found. This is the step that decides whether your ADU fits, what it will cost, and which of the city’s overlay requirements govern the plan. Call (833) 632-6140 and a live person picks up, any hour.
We do this work as the first phase of ADU Design & Permitting, so nothing discovered on site gets lost between a surveyor and a drafter. The measurements, photos, and code notes from the assessment become the constraints the permit set is drawn to. That continuity is why assessments we run rarely get redrawn after plan review.

When You Need Site Assessment
Most homeowners reach this step with one of a few questions in mind. If any of these sound familiar, an assessment is the honest place to start.
- You’re weighing a detached ADU against a garage conversion. The existing garage slab depth, wall height, and header condition decide whether a conversion pencils out. We measure those, then price both paths against your lot’s real constraints.
- Your lot is in a Henderson community with recorded design guidelines. Communities like Anthem, Green Valley Ranch, and Seven Hills carry conditions, covenants, and restrictions (CC&Rs) that sometimes add setbacks beyond what the city requires. The assessment checks those before the plan set commits to a footprint.
- You have a sloping or irregular parcel. Grading, retaining, and drainage on a grade can add $8,000 – $25,000 to a project. A site assessment locates that cost before you choose a prefab system such as those from Abodu or Cover and discover the platform will not sit level.
- You’ve been told your lot may have a utility conflict. A sewer lateral crossing the buildable area, an existing gas line, or a shared transformer pad can relocate the whole structure. We locate them and map the safe envelope.
- You’re bringing a written estimate from another builder. We’ll run a Free Second Opinion on any estimate in hand, and the assessment tells you which line items in that document actually match your lot.
- You’re planning to submit a permit application yourself. The Henderson site plan and plot plan requirements are specific; an assessment gives you the survey data, setbacks, and coverage math an application needs.
Our Site Assessment Process
Every visit produces a documented photo record. What we found is written down, not summarized from memory.
- Records and parcel review off-site. We pull the assessor’s parcel record, zoning, and any recorded CC&Rs before we set foot on the property. In Henderson this often surfaces overlay rules the homeowner didn’t know applied.
- On-site measurement and photo capture. We measure the lot lines, existing structures, easements, and setback distances, and photograph the slab, footing, utility locations, and any grade change. Every photo is indexed to the point it documents.
- Utility and soil check. We locate the sewer lateral, water service, gas, and electrical feed, and note the soil and drainage conditions that will drive the foundation line item. On a lot with heavy caliche near the surface, foundation excavation is a real cost factor, and we name it early.
- Code and constraint summary. We identify the zoning setbacks, maximum lot coverage, height limits, and any Henderson-specific requirement that will bind the design, then explain each in plain terms. A setback variance, for example, is the extra distance the city requires between your new ADU and the property line.
- Written feasibility report. You receive a documented report: buildable envelope, utility locations, constraint list, and a recommended path (detached, conversion, or junior ADU), each with a written price range for the design and permit phase.
- Handoff into design. The report becomes the drawing constraints for the permit set, so the plan set is drawn once against verified facts rather than redrawn after review comments arrive.

Site Assessment Pricing in Henderson
Site assessments in Henderson run $650 – $1,400 depending on lot size, grade, and how many existing structures need measuring. Under Haven Standard Clause 1, you get the written price before any work starts. No line item appears later.
| Line item | Typical range |
|---|---|
| Standard lot assessment (flat grade, single structure) | $650 – $900 |
| Sloped or irregular lot, grading analysis | $900 – $1,400 |
| Existing garage conversion feasibility (slab, header, wall) | $500 – $850 |
| Utility conflict mapping (sewer lateral, gas, electrical) | $300 – $650 |
| Written feasibility report and permit-ready constraint summary | Included |
What moves the cost: lot size, how many existing structures need measuring, whether the lot slopes, and whether utility locating needs a private locate. A flat, clear lot in Green Valley Ranch costs less to assess than a graded parcel in the foothills. On the design side, garage conversion ADUs typically run $95,000 – $160,000 all-in, from drawings through final inspection. The assessment is what tells you which end of that range your lot lands on.
We quote the design and permit phase alongside the construction in one written price. That’s the structure of a design-build studio, and it means the number you see here doesn’t grow by surprise later.
FAQs – Site Assessment
How long does a site assessment take in Henderson?
A site assessment in Henderson takes one to two weeks from the site visit to the written feasibility report. The on-site visit itself is usually a few hours. The remaining time is records review, utility confirmation, and drafting the report.
Can you assess a lot for an ADU I’m building from a prefab brand?
Yes. We assess lots for prefab and modular systems and coordinate the platform footprint with the system you’ve chosen. We specify and coordinate systems from Abodu, Cover, Dvele, Mighty Buildings, and others within the same single contract. The assessment confirms the chosen unit fits your buildable envelope before you commit to it.
Is a site assessment required before I can get a permit set drawn?
A site assessment isn’t a separate city requirement, but it’s the practical prerequisite for a permit set that survives plan review. The Henderson site plan and plot plan requirements call for lot dimensions, setbacks, and easements the assessment produces. Without them, the drafter works from assumptions that get flagged later.
What if my lot sits inside a Henderson community with CC&Rs?
We check recorded CC&Rs during the records review and note any design guidelines that add to the city’s requirements. Communities such as Anthem and Seven Hills sometimes carry setbacks and height rules beyond the base zoning. The report names them so the plan set is drawn to the stricter of the two.
Will the assessment tell me whether my project is feasible at all?
Yes. The written feasibility report tells you whether an ADU fits, which path fits best, and the written price range for design and construction. If a lot genuinely doesn’t support a build, we tell you that in the report rather than drawing a plan that stalls at review. Under the 365-Day Done Right Promise, we’re accountable for the buildings we design and build, drawn to the permitted set and backed in writing before the project starts.
Have a written estimate already? Ask for a Free Second Opinion and we’ll hold it against what a real site assessment says about your lot.
Why Homeowners Choose Ellery ADU Studio Henderson for Site Assessment
Every assessment closes with documentation you keep: a written feasibility report, an indexed photo record, and a written price range for design through construction. Under Haven Standard Clause 5 (No Surprises), the scope locks at signing. No door-side upsells, no scope creep after the report. Our technicians have up to 11 years of experience with Henderson lots, and the studio has designed, permitted, and built 900+ ADUs since 2015, each with a written price before work began. A live person answers our line 24/7.
Ready to know what your lot will allow? Call (833) 632-6140 for a free estimate and to schedule your site assessment in Henderson. We’ll measure the lot, photograph what we find, and hand you a report you can build from.
Written by the team at Ellery ADU Studio Henderson, serving Henderson.