A Ellery company - serving Henderson, NV
A backyard ADU foundation formed and ready to pour
ADU Site Prep & Utilities · Sunrise Manor, NV

ADU Site Prep & Utilities in Sunrise Manor - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Henderson
A small deck outside a new ADU
A former garage converted into a guest house
The sitting area and efficiency kitchen of a junior ADU
The living room inside a new ADU
A bedroom and desk inside a converted garage
An efficiency kitchen in a junior ADU
A new two-story ADU over a garage
An attached garage converted into living space
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Site Prep & Utilities Across Sunrise Manor

If you own a home in Sunrise Manor and you’re weighing a backyard casita or a garage conversion, the site work comes first: grading, foundation, power, water, gas. Get those wrong here and the county plan check stops you cold. Sunrise Manor sits in unincorporated Clark County, so your permit runs through Clark County building and zoning, not the City of Las Vegas. We work that distinction every week, and we quote it in writing before a shovel touches dirt. Call (833) 632-6140 to schedule a free estimate.

Call (833) 632-6140

Why Ellery ADU Studio Henderson Is Sunrise Manor’s Preferred ADU Site Prep & Utilities Company

A fresh concrete slab for a backyard ADU

Our ADU Site Prep & Utilities work in Sunrise Manor is built around one fact most bids miss: this is Clark County territory, and Title 30 setbacks and lot-coverage rules differ from a same-size project a mile west inside city limits. The line between Sunrise Manor and the City of Las Vegas can literally run down a street mid-block. We bid to county rules, so your plan set clears plan check the first time.

Homeowners in 89110 call us because we lead with evidence, not sales talk. Under Clause 1 of The Haven Standard, every project gets a written price before any work starts. Every visit produces a documented photo record: what the soil looked like, where the grading fell, what the panel measured. Nine hundred-plus ADUs designed, permitted, and built since 2015 have all followed that same paperwork standard. A live person answers calls 24/7, and if you already hold a written estimate from another ADU outfit, we’ll give you a free second opinion on it.

Here’s the local knowledge that matters on this page: Sunrise Manor homes are mostly 1960s – 1990s single-story ranch and stucco tract houses on large 6,000 – 7,000 sq ft lots. Those deep rear yards off the alley-fed east-side streets make a full detached unit feasible, not just an attached add-on. We plan for the desert heat and monsoon runoff as part of the foundation and drainage scope, not as an afterthought.

Our ADU Site Prep & Utilities Services in Sunrise Manor

Foundation & Grading

This is the core of the work in Sunrise Manor. A foundation here must be anchored for the wind uplift Clark County’s wind-load chart requires, and the site must slope away from the new unit to shed monsoon runoff. In 89110 we regularly see flat lots with insufficient grading and no dedicated drainage, and that’s the exact problem the storm-drainage detail solves. Our crews specify anchor bolts and hold-downs that meet the county chart, then document the grade before pouring.

Electrical Panel Upgrade

A detached casita with its own mini-split cooling and water heating usually needs more capacity than a 1960s panel was built to carry. We assess the existing panel and service, calculate the load for the new unit, and recommend the upgrade that fits Sunrise Manor’s high-heat, high-draw summers. The work is permitted and inspected, and you get a written scope for the panel line item before we touch it.

Plumbing Lateral

A detached ADU in Sunrise Manor often needs its own lateral to the sewer main, and reusing the existing one depends on pipe condition and distance. We camera and verify before we promise anything. Older stucco tract homes sometimes have clay or aging lines that won’t carry the extra load, so the lateral scope is spelled out with its own number.

Gas Line Extension

If the casita runs gas for cooking, a water heater, or a dryer, the line extends from the meter or existing trunk with the right sizing and shutoff. We size the line for the new load, run it permitted, and inspect it. The gas scope is written into the same single contract as everything else, so no separate trade is left to point at another when a fitting leaks.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (833) 632-6140

Trusted Brands We Service in Sunrise Manor

We specify and coordinate prefab and modular systems from Cover, Dvele, and Mighty Buildings within the same single contract as the site work. When a homeowner in Sunrise Manor goes this route, the factory-built unit and the foundation, drainage, and utility tie-ins have to be designed together; the wind-load anchoring and the drainage detail don’t change because the walls arrive on a truck. We don’t stock parts, and we don’t own trucks or a warehouse. We coordinate the system and the site so the pieces line up, and the written scope covers both. Coordination is fast because it’s one contract.

Common ADU Site Prep & Utilities Problems We See in Sunrise Manor Homes

  • City rules applied to a county lot. A contractor who bids Sunrise Manor using City of Las Vegas setback and lot-coverage rules will fail the Clark County plan check and force a costly redesign. We verify the jurisdiction before we draw a single line.
  • Monsoon drainage left out of the bid. After a downpour, homeowners on flat lots in 89110 see water pooling against the garage slab where the ADU is planned. The usual fix is regrading the site to slope away and installing a French or channel drain tied to a daylight outlet.
  • Standard anchor bolts where county hold-downs are required. Skipping wind-load anchoring fails inspection and can jeopardize an insurance claim later. We specify anchor bolts and hold-downs to the county chart as part of the foundation scope.
  • Undersized panels and aging laterals. A 1960s panel and a clay sewer line will strain under a new detached unit. We assess both before we quote, so the upgrade numbers are real numbers.

Pricing for ADU Site Prep & Utilities in Sunrise Manor, NV

Honest Sunrise Manor pricing looks like this. Foundation and grading for a detached casita typically runs $9,000 – $18,000, with the wind-load anchoring and monsoon drainage included. An electrical panel upgrade runs $2,500 – $5,500. A new plumbing lateral runs $3,000 – $7,500. A gas line extension runs $1,200 – $3,500. Landscaping and hardscape around the new unit add $3,000 – $9,000. Those ranges move with lot grade, distance to the sewer main, and utility trenching. Every project is quoted with a written price before any work begins, under Haven Clause 1: the words “call for a quote” don’t appear on our site for a reason. Call (833) 632-6140 for a free estimate.

We Also Serve Cities Near Sunrise Manor

We work ADU site prep and utilities beyond Sunrise Manor, into Whitney, Winchester, Las Vegas, and North Las Vegas. If you’re near the county line, our ADU Site Prep & Utilities in Sunrise Manor page is the starting point, and our team knows where the Clark County rules give way to city rules. Call (833) 632-6140 wherever you are.

Serving Sunrise Manor, NV – Our Local Coverage Area

We serve Sunrise Manor and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – ADU Site Prep & Utilities in Sunrise Manor

A utility trench with new sewer pipe and conduit

Why Sunrise Manor Chooses Ellery ADU Studio Henderson

We set the standard for ADU site prep & utilities in Sunrise Manor.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunrise Manor

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunrise Manor Customers Say

Trusted by homeowners across Sunrise Manor and surrounding areas.

★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."

Benedict H.

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
A new bathroom inside a converted garageThe bedroom inside a new ADUThe bathroom inside a new ADUA compact kitchen inside a new ADUA kitchenette inside a converted garageA new modern ADU with wood cladding

More ADU services in Sunrise Manor

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in Henderson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Henderson team

A local vetted partner works across Henderson and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Sunrise Manor?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunrise Manor.

(833) 632-6140

Request a Free Estimate in Sunrise Manor

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch