







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateFast, Reliable ADU Site Prep & Utilities Across Sunrise Manor
If you own a home in Sunrise Manor and you’re weighing a backyard casita or a garage conversion, the site work comes first: grading, foundation, power, water, gas. Get those wrong here and the county plan check stops you cold. Sunrise Manor sits in unincorporated Clark County, so your permit runs through Clark County building and zoning, not the City of Las Vegas. We work that distinction every week, and we quote it in writing before a shovel touches dirt. Call (833) 632-6140 to schedule a free estimate.
Why Ellery ADU Studio Henderson Is Sunrise Manor’s Preferred ADU Site Prep & Utilities Company

Our ADU Site Prep & Utilities work in Sunrise Manor is built around one fact most bids miss: this is Clark County territory, and Title 30 setbacks and lot-coverage rules differ from a same-size project a mile west inside city limits. The line between Sunrise Manor and the City of Las Vegas can literally run down a street mid-block. We bid to county rules, so your plan set clears plan check the first time.
Homeowners in 89110 call us because we lead with evidence, not sales talk. Under Clause 1 of The Haven Standard, every project gets a written price before any work starts. Every visit produces a documented photo record: what the soil looked like, where the grading fell, what the panel measured. Nine hundred-plus ADUs designed, permitted, and built since 2015 have all followed that same paperwork standard. A live person answers calls 24/7, and if you already hold a written estimate from another ADU outfit, we’ll give you a free second opinion on it.
Here’s the local knowledge that matters on this page: Sunrise Manor homes are mostly 1960s – 1990s single-story ranch and stucco tract houses on large 6,000 – 7,000 sq ft lots. Those deep rear yards off the alley-fed east-side streets make a full detached unit feasible, not just an attached add-on. We plan for the desert heat and monsoon runoff as part of the foundation and drainage scope, not as an afterthought.
Our ADU Site Prep & Utilities Services in Sunrise Manor
Foundation & Grading
This is the core of the work in Sunrise Manor. A foundation here must be anchored for the wind uplift Clark County’s wind-load chart requires, and the site must slope away from the new unit to shed monsoon runoff. In 89110 we regularly see flat lots with insufficient grading and no dedicated drainage, and that’s the exact problem the storm-drainage detail solves. Our crews specify anchor bolts and hold-downs that meet the county chart, then document the grade before pouring.
Electrical Panel Upgrade
A detached casita with its own mini-split cooling and water heating usually needs more capacity than a 1960s panel was built to carry. We assess the existing panel and service, calculate the load for the new unit, and recommend the upgrade that fits Sunrise Manor’s high-heat, high-draw summers. The work is permitted and inspected, and you get a written scope for the panel line item before we touch it.
Plumbing Lateral
A detached ADU in Sunrise Manor often needs its own lateral to the sewer main, and reusing the existing one depends on pipe condition and distance. We camera and verify before we promise anything. Older stucco tract homes sometimes have clay or aging lines that won’t carry the extra load, so the lateral scope is spelled out with its own number.
Gas Line Extension
If the casita runs gas for cooking, a water heater, or a dryer, the line extends from the meter or existing trunk with the right sizing and shutoff. We size the line for the new load, run it permitted, and inspect it. The gas scope is written into the same single contract as everything else, so no separate trade is left to point at another when a fitting leaks.
Trusted Brands We Service in Sunrise Manor
We specify and coordinate prefab and modular systems from Cover, Dvele, and Mighty Buildings within the same single contract as the site work. When a homeowner in Sunrise Manor goes this route, the factory-built unit and the foundation, drainage, and utility tie-ins have to be designed together; the wind-load anchoring and the drainage detail don’t change because the walls arrive on a truck. We don’t stock parts, and we don’t own trucks or a warehouse. We coordinate the system and the site so the pieces line up, and the written scope covers both. Coordination is fast because it’s one contract.
Common ADU Site Prep & Utilities Problems We See in Sunrise Manor Homes
- City rules applied to a county lot. A contractor who bids Sunrise Manor using City of Las Vegas setback and lot-coverage rules will fail the Clark County plan check and force a costly redesign. We verify the jurisdiction before we draw a single line.
- Monsoon drainage left out of the bid. After a downpour, homeowners on flat lots in 89110 see water pooling against the garage slab where the ADU is planned. The usual fix is regrading the site to slope away and installing a French or channel drain tied to a daylight outlet.
- Standard anchor bolts where county hold-downs are required. Skipping wind-load anchoring fails inspection and can jeopardize an insurance claim later. We specify anchor bolts and hold-downs to the county chart as part of the foundation scope.
- Undersized panels and aging laterals. A 1960s panel and a clay sewer line will strain under a new detached unit. We assess both before we quote, so the upgrade numbers are real numbers.
Pricing for ADU Site Prep & Utilities in Sunrise Manor, NV
Honest Sunrise Manor pricing looks like this. Foundation and grading for a detached casita typically runs $9,000 – $18,000, with the wind-load anchoring and monsoon drainage included. An electrical panel upgrade runs $2,500 – $5,500. A new plumbing lateral runs $3,000 – $7,500. A gas line extension runs $1,200 – $3,500. Landscaping and hardscape around the new unit add $3,000 – $9,000. Those ranges move with lot grade, distance to the sewer main, and utility trenching. Every project is quoted with a written price before any work begins, under Haven Clause 1: the words “call for a quote” don’t appear on our site for a reason. Call (833) 632-6140 for a free estimate.
We Also Serve Cities Near Sunrise Manor
We work ADU site prep and utilities beyond Sunrise Manor, into Whitney, Winchester, Las Vegas, and North Las Vegas. If you’re near the county line, our ADU Site Prep & Utilities in Sunrise Manor page is the starting point, and our team knows where the Clark County rules give way to city rules. Call (833) 632-6140 wherever you are.
Serving Sunrise Manor, NV – Our Local Coverage Area
We serve Sunrise Manor and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – ADU Site Prep & Utilities in Sunrise Manor

Yes. Sunrise Manor is unincorporated Clark County, so your ADU follows Title 30 setbacks, lot-coverage, and permitting rather than City of Las Vegas rules, and the foundation must be anchored for the wind uplift on the county’s wind-load chart. A design drawn to Las Vegas standards can fail county plan check. We verify the jurisdiction and match the design before quoting. Call (833) 632-6140 for a free estimate on your lot.
Monsoon flash-flood bursts hit flat lots hard, so site prep here must slope the grade away from the new foundation and add a French or channel drain tied to a daylight outlet. Without that, water pools against the slab and undermines the foundation. A compliant Sunrise Manor quote includes the drainage; a cheap bid often leaves it out. Call (833) 632-6140 to get a written scope that itemizes it.
Most 89110 casitas need a panel upgrade or a dedicated subpanel, because a 1960s panel plus a new mini-split and water heater exceeds the old service capacity. We calculate the ADU load against the existing panel and specify the upgrade that fits. The work is permitted and inspected, with its own line item. Call (833) 632-6140 for an exact quote on your panel.
Sometimes, but it depends on pipe condition and distance to the main, so we camera and verify before promising it. Older stucco tract homes in Sunrise Manor often have clay or aging lines that won’t carry the extra load cleanly. If reuse works, you save; if not, the new lateral is quoted at its own number. Call (833) 632-6140 for a free estimate.
It can. A foundation anchored with the county-required hold-downs and anchor bolts, backed by a documented photo record and passed inspection, gives your insurer clear evidence of compliant construction. Skipped anchoring can complicate a storm-damage claim. We photograph the anchoring before the pour and keep the record with your project file. Call (833) 632-6140 to review your site.
If your Sunrise Manor lot is ready for serious site work, the next step is a written price, not a sales visit. Call (833) 632-6140 to schedule your free estimate. Ellery ADU Studio brings drawings, permits, and construction under one contract at one written price, so neither the designer nor the builder can point at the other when something is off. Our ADU Site Prep & Utilities team handles the foundation, drainage, electrical, plumbing, and gas work that lets your casita stand up to a Sunrise Manor summer.
Written by the team at Ellery ADU Studio.










